模极社社区 - 制造业全产业链交流平台

    • 注册
    • 登录
    • 版块
    • 最新
    • 话题
    • 热门
    • 用户
    • 群组

    5 Key Metrics Every Mold Shop Should Track

    设计研发
    1
    1
    0
    正在加载更多帖子
    • 从旧到新
    • 从新到旧
    • 最多赞同
    回复
    • 在新帖中回复
    登录后回复
    此主题已被删除。只有拥有主题管理权限的用户可以查看。
    • C
      casting_723 最后由 编辑

      Tracking the right KPIs helps mold shops identify inefficiencies and improve profitability.

      1. First-Shot Acceptance Rate

      • Target: 85%+
      • What it measures: Percentage of molds that produce acceptable parts on first tryout
      • Why it matters: High rate = good design and machining accuracy; each rework costs 500-3000

      2. Machine Utilization Rate

      • Target: 75-85% for well-run shops
      • What it measures: Actual cutting time vs available machine time
      • Why it matters: A shop with 10 CNCs at 65% utilization effectively has 6.5 machines working

      3. On-Time Delivery Rate

      • Target: 95%+
      • What it measures: Molds delivered on or before promised date
      • Why it matters: Late delivery costs penalties and damages reputation

      4. Rework Cost as Percentage of Job Value

      • Target: Under 3%
      • What it measures: Cost to fix errors vs total job value
      • Why it matters: Each percentage point over 3% directly reduces margin

      5. Average Quote-to-Order Conversion

      • Target: Industry average is 30-40%
      • What it measures: Percentage of quoted jobs won
      • Why it matters: Low conversion may mean pricing is wrong or sales process needs work

      Action Item: Pick the 2 metrics most relevant to your current pain points and start tracking monthly.

      📎 延伸阅读
      • 欢迎来到 模极社 - 模具行业专业社区!👋
      • 注塑件缩水和变形的调机思路
      • 小模具厂如何在价格战中活下去?


      还有什么补充参数吗?一起完善。

      1 条回复 最后回复 回复 引用 0
      • First post
        Last post
      Powered by NodeBB | Contributors